GEPCO New Meter Charges – Demand Notice Fee 2026
The most common question these days is how to apply for a new connection and what are the charges for a GEPCO demand notice. Most people prefer a new meter to divide their load and stay within the protected consumer limit.
Commercial and industrial consumers with extra load also prefer installing a new meter. Before applying for a new connection you can always do a quick GEPCO Bill Check to review your current consumption and decide whether a new meter is the right choice for you.

GEPCO New Meter Charges:
GEPCO meter installation charges depend on the type of phase and the length of wiring required for your connection. Here are the estimated charges for 2026:
Connection Type | Approx Demand notice charge |
Single phase meter | PKR 8500-11500 (plus security fee |
Three phase meter | PKR 33000 -50000 (plus security fee) |
Installation Information
The following documents and information are required for a new meter installation:
- Your CNIC
- Ownership proof
- Neighbours recent bill
- Wiring test report from a licensed wiring contractor.
- Undertaking with necessary declaration that why you need your meter.

Key Takeaways
Here are some key takeaways for the new connection:
- Your connection type determines whether you need a single phase or triple phase meter.
- Demand notice fee is charged according to your connection type and must be paid on time.
- If your meter location is far from the connection point, extra charges will apply for additional wiring.
- All required documents must be complete including ownership proof.
- A mandatory GEPCO survey will be conducted before installation.
What is GEPCO Online Application for New Connection in 2026?
GEPCO consumers can now apply for a new connection online through the electricity new connection website. Simply upload all required documents, pay your demand notice fee and submit your application from anywhere without visiting any office.

What are GEPCO New Meter Charges?
Here is the summary of GEPCO new meter charges that are estimated to lie for 2026:
- Single phase domestic meter costs approximately PKR 10,000 to 10,500 along with a 4 meter wire.
- Triple phase meter costs approximately PKR 43,000 along with a 40 meter wire.
Eligibility Criteria for New Meter Installation
You are eligible to apply for a new meter if you have valid ownership proof for the property where you want the new connection installed.
Required Documents for Application
All you need is your own CNIC, ownership proof, demand notice, neighbours recent electricity proof and your connection survey by the team.
How to Apply for GEPCO new Meter Connection
You can apply for a new connection both online and offline. For online applications, visit the electricity new connection website, fill out the application form and attach all required documents. For offline applications, visit your nearest GEPCO retailer or office and collect the application form from there.
Final Words
Getting a new GEPCO meter connection has become much easier and more convenient than before. Whether you apply online or visit your nearest office, the process is straightforward as long as you have all the required documents ready. Make sure you pay your demand notice fee on time and complete the mandatory survey to get your new meter installed without any delays.